Cloacina MEMPAC-I package wastewater treatment plants include cross flow media which provides a surface for the growth of beneficial treatment bacteria. This video shows the fabrication team loading media into the 5,000 GPD system built for Von Strasser Winery in preparation for Factory Acceptance Testing (FAT).
10,000 GPD MEMPAC-E COMING SOON TO SYLMAR, CA
Cloacina is proud to announce that a 10,000 gallon per day MEMPAC-E is coming soon to the Gold Creek Center, a religious retreat, located in Sylmar, CA. The remote project location will make for a challenging installation and Cloacina will deliver and assemble the system for the client’s installation contractor. The client plans to reclaim the treated effluent for subsurface irrigation. We are excited to work with Waterworks Technology on this project. Stay tuned for more details and photos!
See how ponds compare to Cloacina’s MEMPAC-I
Considering a wastewater treatment pond? See how ponds compare to Cloacina’s MEMPAC-I and learn more about which treatment solution is right for your wastewater project.
San Antonio Winery Case Study
NEW CASE STUDY! View sample results and learn more about the 15,000 gallon per day MEMPAC-I that was installed at San Antonio Wines in Paso Robles, CA!
https://www.cloacina.com/sanantoniowinery
Booker Winery Award of Contract
See why Booker Winery selected Cloacina to manufacture a 2,500 GPD MEMPAC-I for their facility located in Paso Robles, CA.
Coming Soon to Sonoma, CA
Coming soon to the factory floor is a 25,000 gallon per day MEMPAC-I for Mayacamas Warehousing in Sonoma, CA. The client had land that he wanted to develop, but due to water restrictions his available permitted uses limited him to very few potential tenants. With the installation of the Cloacina MEMPAC-I, he was able to get approval for a tenant that will recycle and reclaim 100% of their treated effluent. We are excited to work with The Wallace Group on this project! Stay tuned for project photos and information!
MEMPAC-M Tour
Summer Interns
We are excited to welcome Sam Shearin and Cole Nally to Cloacina for the summer! Sam, a student at Lehi University in Pennsylvania, is working with the Design Team as an engineering intern. Cole is enrolled in the PG&E Academy at Arroyo Grande High School. He hopes to study construction management in college and will be assisting the Fabrication Team on the factory floor.