SAW Web Resources-15.png
SAW Web Resources-04.png

PROJECT TEAM

 Construction Management  San Luis Obispo, CA  805.544.3130  www.jwdci.com

Construction Management

San Luis Obispo, CA

805.544.3130

www.jwdci.com

 Engineer  Rob Miller  San Luis Obispo, CA  805.544.4011

Engineer

Rob Miller

San Luis Obispo, CA

805.544.4011

 Equipment Sales Rep  Brent Cromar  El Dorado Hills, CA  916.933.5500

Equipment Sales Rep

Brent Cromar

El Dorado Hills, CA

916.933.5500

 Installation Contractor  Robin Ransford  Arroyo Grande, CA  805.597.7100

Installation Contractor

Robin Ransford

Arroyo Grande, CA

805.597.7100

SAW Web Resources-07.png
  • Cloacina provided a complete pretreatment system for a family-owned winery
  • The Cloacina system was delivered in one, factory-assembled treatment train
  • The MEMPAC-I was installed and ready to receive process waste within 21 working days from the date of delivery
  • Cloacina provided the winery staff with an Operations and Maintenance Manual (OMM), operator checklist, draft reporting documents, necessary Standard Operating Procedures (SOP) and on-site training
  • San Antonio Winery currently utilizes treated effluent for facility landscaping and irrigation
  • The client has yet to discharge wastewater to the sanitary sewer connection
SAW Web Resources-10.png
SAW Web Resources-25.png

“I would highly recommend Cloacina to anyone looking for a range of projects from septic lift stations to winery wastewater treatment plants.”

Anthony Riboli, San Antonio Winery 

SAW Web Resources-09.png

INFLUENT PARAMETERS

MODEL SUPPLIED

SAW Web Resources-16.png
SAW Web Resources-17.png

EFFLUENT QUALITY

 
SAW-67.png
 
SAW Web Resources-14.png
SAW Web Resources-08.png
Screen Shot 2018-03-13 at 3.10.11 PM.png

LIFT STATION: Package fiberglass duplex pump station which includes: slide rails, pump bases, pumps, level transducer, redundant floats, valve vault, isolation valves, aluminum lid and two locking hatches

HEADWORKS: 25,000 gallon equalization storage, equalization pumps, influent flow meter, self-cleaning auger screen, grit trap and automated pH correction system with sensor, pump and controls

PRIMARY TREATMENT: Roughing filter, fixed media, distribution header, aeration blower and header and aeration feed valve

SECONDARY TREATMENT: Fine bubble aeration diffusers, aeration blower, dissolved oxygen sensor and RAS pump

CLARIFICATION: Flat sheet membrane cassette, level transducer, air supply valve, permeate pump, CFM meter, online MLSS meter, clean in place pump, effluent pump, effluent flow meter and sludge wasting pump

CONTROLS: Stainless steel MCC panel, touch screen controls computer, SCADA program and isolation switches

ADDITIONAL: Aluminum stairs and catwalk, automatic cleaning
of sensory equipment, stormwater lift station and irrigation pump skid

SOLIDS DISPOSAL: 8 GPM volute dewatering press with 10,000 gallon aerated storage tank and polymer addition system 

AS SEEN IN

SAW Web Resources-23.png
 
web-header-RBG-2-05-05.jpg
SAW Web Resources-06.png
SAW Web Resources-05.png
SAW-Web-1.jpg
SAW-Web-3.JPG
SAW-Web-2.jpg
SAW-Web-5.jpg
SAW-Web-4.jpg