Check out our latest product animation! This video shows an overview of the entire treatment process for Cloacina's MEMPAC-M membrane bioreactor designed specifically for domestic/municipal projects.
Rigorous Factory Acceptance Testing
All Cloacina package plants and equipment are factory-assembled, filled with fresh water and rigorously tested as a complete and operational system before they leave the factory. Some of our Factory Acceptance Testing (FAT) protocol includes:
• All tankage is checked to ensure it is constructed to the exact specifications of the drawings
• All inside and outside welds are checked and determined to be leak free
• All interior tank compartments are determined to be leak free
• All pipe penetrations are determined to be leak free
• All tank compartments are cleaned and determined to be leak free
• All welds are cleaned and passivated (Cloacina uses a chemical and electrical passivation process)
• All exterior walls are determined to be leak free
• All exterior penetrations are determined to be leak free
• All electrical equipment is rotation tested
• All electrical equipment full load amps are verified and recorded for baseline establishment
• All tank compartments are determined to be free of slag and then passivated inside
• Controls system alarms, trending, notifications and set-points are verified and recorded
• If applicable, the hatch door is assembled and is determined to be leak free
• All exterior welds on the tank are brushed and free of spatter and slag
• All manual processes are performed and adjusted for ease of operation
• Initial set-points for all equipment are logged
Coming Soon!
Cloacina is pleased to announce that a 10,000 Gallon Per Day (GPD) MEMPAC-I is coming in the fall of 2018 to Ancient Peaks Winery in Paso Robles, CA. For more information about Ancient Peaks Winery, visit http://www.ancientpeaks.com/
WIVI 2018
We are excited to be exhibiting at WiVi again this year on Wednesday, March 21! Drop by booth 221 and view scale models of our package wastewater treatment plants designed specifically for wineries. WiVi is the largest wine and viticulture symposium and trade show on the Central Coast. For tickets or more information, please visit http://www.wivicentralcoast.com/
What to Expect from Cloacina in 2018
This is shaping up to be quite a year for Cloacina! See what is new and what to expect from us in 2018 in our newest video!
Coming Soon!
We are proud to announce that a 50,000 Gallons Per Day (GPD) MEMPAC-E is coming soon to the Santiago Country View Estates Mobile Home Park in Kennewick, WA. We are excited to work with Harms Engineering on this project!
2018 Open House
Don't miss this opportunity to see a completely operational, 332,000 Gallons Per Day (GPD) MEMPAC-M package wastewater treatment plant during factoring testing! Come inspect the system and meet the designers, engineers, programmers and fabricators of this revolutionary domestic/municipal system!
Thursday, April 19, 2018
12:00 – 6:00 p.m.
2385 Precision Drive, Arroyo Grande, CA
Refreshments will be served
Our staff will be available for individual tours throughout the day
Headpac™ Timelapse
Check out the production time-lapse of Cloacina’s newest domestic/municipal product, the HEADPAC, a packaged headworks system which includes Duperon Corporation's FlexRake screen. This 3,000,000 Gallons Per Day (GPD) unit was manufactured for the Riverbend Environmental Complex in Ball Ground, GA.
For more information on the HEADPAC, visit https://www.cloacina.com/headpac-packaged-headworks-system/


