Package wastewater treatment plant

COMING SOON TO BEHRENS FAMILY WINERY

bfw_nv_logo.png

Cloacina is designing and manufacturing a 2,000 Gallon per Day (GPD) Stage I treatment system for the Behrens Family Winery in St. Helena, CA. The client was looking for a wastewater solution that would allow them to reclaim treated effluent for irrigation purposes.  The Stage I, a small package wastewater treatment plant, would allow the Behrens Family to reclaim approximately 700,000 gallons of water per year if the facility is running at full capacity!  Stay tuned for more details on this project.

EVERY DROP COUNTS: HOW ONE OPERATOR IS PROTECTING THE ENVIROMENT

Protecting the environment and our water resources is one of the driving forces behind every decision that is made at Cloacina. Based in CA, a state often facing drought conditions, Cloacina understands that EVERY DROP OF WATER COUNTS! We manufacture package wastewater treatment plants that allow clients to reclaim up to 100% of their treated effluent for irrigation and sanitation purposes.

Cloacina is proud to launch our new environmental video series and give you a peek into how our employees do their part, every day, to protect our water resources!

STAINLESS STEEL PACKAGE WASTEWATER TREATMENT PLANT HEADING TO A WINERY IN LIVERMORE

Nearing completion on the factory floor is a Mempac – I package wastewater treatment plant designed and manufactured specifically to treat winery process waste. This unit is capable of treating 25,000 GPD.

Cloacina’s winery models treat high-strength winery waste with various flow ranges and discharge requirements and produce high-quality effluent suitable for reuse. All tankage and equipment skids are fabricated from stainless steel to facilitate long-term treatment while maintaining the high aesthetic standards of wineries. The energy-efficient winery models are designed to handle the cyclical organic and hydraulic loading associated with wine making. An integrated pH adjustment system automatically controls pH levels and the SCADA/controls package allows personnel to monitor and make changes to the system through any device with an Internet connection.

The  system is scheduled to be operational by the end of April. Stay tuned for installation and commissioning details!

COMING SOON TO A MOBILE HOME PARK IN OXNARD

Cloacina is proud to announce that we are beginning construction on a 4,000 GPD Mempac-M economy package wastewater treatment plant. The client had a limited project budget which led our Design Team to engineer an economy model that could meet both the budgetary and discharge requirements of the project. This unit will be installed in a mobile home park in Oxnard, CA.

Stay tuned for construction, installation and commissioning details!

EVERY DROP COUNTS: HOW ONE FABRICATOR IS PROTECTING THE ENVIRONMENT

Protecting the environment and our water resources is one of the driving forces behind every decision that is made at Cloacina. Based in CA, a state often facing drought conditions, Cloacina understands that EVERY DROP OF WATER COUNTS! We manufacture package wastewater treatment plants that allow clients to reclaim up to 100% of their treated effluent for irrigation and sanitation purposes.

Cloacina is proud to launch our new environmental video series and give you a peek into how our employees do their part, every day, to protect our water resources!

WIVI 2017 RECAP

Here are some highlights from WiVi 2017 in Paso Robles.  WiVi is a great resource for local members of the wine industry and Cloacina was proud to be a part of it!