This was a phased project capable of treating up to 1.5 MGD comprised of three separate .5 MGD package wastewater treatment plants. This project was a design/build effort with Fluid Resource Management (FRM) and other sub-contractors.
Cloacina's scope included providing a lift station, Mempac-M250 package treatment plant with UV disinfection and a DRYPAC Aerated Sludge Handling System, all with a fully integrated controls system including remote monitoring and alarming. Learn more at https://www.cloacina.com/community-development