CookieBot
Zoom Info code injection

MEMPAC-R

When regulations shift, outdated wastewater systems can become costly liabilities.

One facility faced this exact challenge. Their aging treatment system no longer met state requirements, and they needed a fast, dependable solution to stay compliant and avoid disruption.

Cloacina stepped in with the MEMPAC-R system.

In collaboration with the project engineering team, we installed a fully operational temporary plant in just one week. With minimal site prep required, the system was up and running quickly, using only a level space the size of a semi-trailer and basic utility connections.

The result:

✔ Full compliance

✔ No operational downtime

✔ Time and flexibility to plan a permanent upgrade

Our integrated remote monitoring made oversight simple, giving the client confidence and control throughout the process.

When regulations change, Cloacina helps you adapt without compromise. https://www.cloacina.com/rental-mbr

#Cloacina #WastewaterTreatment #MEMPACR #RegulatoryCompliance #InfrastructureSolutions #MunicipalSystems #EngineeredForEase