CookieBot
Zoom Info code injection

 

MEMPAC-M2 THROUGH M12

Phased treatment designed to grow with your project.

For domestic wastewater projects where treatment capacity will be installed in planned phases, the MEMPAC-M Series offers six phased, expandable models with design flows from 167,000 to 1,000,000 GPD. Future phases are incorporated into the initial system design, equipment configuration, and site layout so treatment capacity can be added as planned.

PHASED EXPANSION PLANNING

Build today with future phases in mind.

Phased expansion begins during the project’s initial design. Cloacina works with the project team to evaluate current treatment needs, anticipated growth, site conditions, and the expected timing of future capacity.

The system layout and equipment configuration are then developed around the planned phases. Projects that may require future treatment capacity should establish the phased approach before the initial system is designed.

PLANNING CONSIDERATIONS

01

Current Treatment Needs

The initial phase is designed to provide the treatment capacity required for the project’s current stage.

02

Anticipated Project Growth

Expected development, future wastewater flows, and the timing of additional capacity help define the planned phases.

03

Integrated Site and System Planning

The equipment configuration and site layout are developed with both the initial system and future phases in mind.

04

Important Planning Note

Phased expansion must be incorporated into the initial project design. It cannot be added to a system that was originally designed for a single build-out.

AVAILABLE MODELS

Six models available for phased expansion.

The Phased Expansion Path includes six MEMPAC-M models with design flows ranging from 167,000 to 1,000,000 GPD. Cloacina determines the appropriate model, initial capacity, and planned phases based on the project’s current needs and anticipated growth.

MEMPAC-M2

Average Annual Flow 111,000 GPD
Design Flow 167,000 GPD

MEMPAC-M3

Average Annual Flow 166,000 GPD
Design Flow 249,000 GPD

MEMPAC-M4

Average Annual Flow 224,000 GPD
Design Flow 336,000 GPD

MEMPAC-M6

Average Annual Flow 333,000 GPD
Design Flow 500,000 GPD

MEMPAC-M9

Average Annual Flow 500,000 GPD
Design Flow 750,000 GPD

MEMPAC-M12

Average Annual Flow 667,000 GPD
Design Flow 1,000,000 GPD

Final treatment requirements, phasing plans, and system configurations are project-specific.

TYPICAL APPLICATIONS

Domestic wastewater treatment for a wide range of projects.

Phased, expandable MEMPAC-M systems can support domestic wastewater projects where treatment demand is expected to increase as development occurs. Every project is evaluated individually based on its flow, anticipated growth, site conditions, and treatment requirements.

Residential and Community Development

  • Housing developments
  • Mobile home and RV communities
  • Small municipalities and utilities

Public and Institutional Facilities

  • Schools
  • Rest areas
  • Detention centers

Recreation and Hospitality

  • Campgrounds and recreational facilities
  • Resorts and lodges
  • Theme parks, zoos, and gardens

Existing Wastewater Infrastructure

  • Municipal upgrades
  • Supplemental treatment at existing wastewater facilities

THE MEMPAC-M STANDARD

One series.
One standard of quality.

Phased, expandable MEMPAC-M systems are grounded in the same Cloacina principles found throughout the series: proven pre-engineering, quality materials and components, integrated equipment and controls, factory installation and wet testing, and single-point responsibility.

SHARED PRINCIPLES

Proven Pre-Engineering

MEMPAC-M systems are extensively refined and informed by real-world operating experience. Pre-engineering helps reduce project risk, support consistency, and streamline design and production.

Quality Materials and Components

Stainless-steel tankage and corrosion-resistant components support durability, quality, and long-term system performance.

Integrated Equipment and Controls

Treatment equipment, controls, monitoring, and operator-access features are integrated into a coordinated packaged system.

Factory Installation and Wet Testing

Equipment is installed and wet-tested at Cloacina’s manufacturing facility before shipment, supporting quality control and reducing field integration.

Single-Point Responsibility

Cloacina provides an integrated treatment solution supported by technical expertise, operator training, remote support, and lifecycle services.

TREATMENT PROCESS AND PERFORMANCE

Advanced treatment. High-quality effluent.

MEMPAC-M systems combine activated sludge treatment with membrane clarification. The membrane barrier retains suspended solids within the biological process, producing high-quality effluent.

The systems incorporate Cloacina’s Forward Activated Sludge process to provide the motive force needed to maintain appropriate viscosity at the membrane interface.

INCOMING WASTEWATER

Typical Influent Parameters

TSS 350 mg/L
BOD5 360 mg/L
Temperature 50–77 °F
TN 60 mg/L

TREATED WATER

Typical Effluent Parameters

TSS <5–<10 mg/L
BOD5 <5–<10 mg/L
TN <3–<10 mg/L
TP <1–<10 mg/L

Lower effluent limits may require additional engineering and process equipment. Final treatment requirements and system configuration are project-specific.

OPERATOR-CENTERED BY DESIGN

Designed by operators, for operators.

Cloacina MEMPAC-M systems are informed by decades of hands-on wastewater operations experience. Equipment access, controls, monitoring, redundancy, and maintenance are considered as part of a complete system so operators can work safely and efficiently.

Accessible Equipment Layout

Equipment is arranged to support visibility, accessibility, and routine maintenance while minimizing unnecessary disruption to plant operation.

Cloacina Slide Rail System

Sensors and submerged equipment are mounted on Cloacina’s Slide Rail System, providing safe, repeatable access while reducing cord tangling and physical strain.

Advanced Controls and Monitoring

Intuitive controls, Human-Machine Interface access, process monitoring, trending, and remote support give operators better visibility into system performance.

Membrane-System Redundancy

Independent membrane trains and redundant equipment support maintenance and cleaning while helping preserve treatment capacity.

Automated Foam Control

Integrated foam-control features help manage buildup and reduce the need for operator intervention.

Specific features and equipment may vary by model and project configuration.

TECHNICAL RESOURCES

Explore phased, expandable
MEMPAC-M systems.

PROJECT EXPERIENCE

Representative Project Experience

See how Cloacina’s MEMPAC-M technology has been applied in an operating wastewater treatment facility.

View Avila Beach Project Summary

START THE CONVERSATION

Plan the right MEMPAC-M system for your project’s growth.

Phased expansion begins with early planning. Contact the Cloacina Sales Team to discuss your project’s current capacity needs, anticipated growth, treatment requirements, and site conditions.