CookieBot
Zoom Info code injection

DESIGN PARAMETERS

OVERVIEW

This was a phased project capable of treating up to 1.5 MGD comprised of three separate .5 MGD package wastewater treatment plants. This project was a design/build effort with Fluid Resource Management (FRM) and other sub-contractors. Cloacina's scope included providing a lift station, Mempac-M250 package treatment plant with UV disinfection and a DRYPAC Aerated Sludge Handling System, all with a fully integrated controls system including remote monitoring and alarming.

CLOACINA SUPPLIED THE FOLLOWING
FOR THIS PROJECT:

Follow the journey of Cloacina's 250,000 GPD Municipal Mempac Bioreactor from early manufacturing to final installation. The project will treat waste from the Valley Children's Hospital and housing development in Madera, California. Wastewater Treatment Plant Manufacturer: Cloacina Engineering/Design: MKN and Associates Treatment Plant Installation: Fluid Resource Management

PERFORMANCE