DESIGN PARAMETERS

PROJECT TEAM

Cloacina provided a complete pretreatment system for the property owner who leases the facility to a winery client

The system was delivered in two complete trains

The MEMPAC-I was installed and ready to receive process waste in 14 business days

Cloacina provided the winery staff with an Operations and Maintenance Manual (OMM), operator checklists, draft reporting documents, Standard Operating Procedures (SOP) and on-site training

The MBR effluent quality exceeded the discharge requirements to such a degree that the Client is considering utilizing the treated effluent as supplemental irrigation water on a public sports field adjacent to the vineyard

The client has a permit with the Regional Water Quality Control Board (RWQCB) for irrigating on-site landscaping with the treated effluent to limit discharge to the sanitary sewer